AI racks supplied, powered and tested.

AI & Data Blueprint

AI racks supplied, powered and tested.

  • What to ask every vendor.

    What to specify for an AI compute block on NVIDIA DGX B300, how it recovers from each failure, and how to test it.

16

DGX B300 systems per block

4

DGX B300 per rack

> 50 kW

Per compute rack

800 Gbps

XDR InfiniBand compute fabric

30 kW

Per rack, the hall's rating

≤ 220 kW

Per rack on the Rubin path

Who it is for.

For the head of research computing or the CTO buying an on-premises training or inference block in 2026, who has a data hall with a power number and needs the block to arrive built, burned in and cabled to a plan, with a path to the platform NVIDIA ships next. Sized for 16 DGX B300 systems, inference plus fine-tuning, a hall rated at 30 kW per rack on air.

What is in, what is out.

In: the DGX B300 block, its compute and storage fabrics, management nodes, racks, power and cooling plan, staging and burn-in, acceptance, and the Rubin NVL8 upgrade path. Out: models and data pipelines, the enterprise network and the second scalable unit.

Tested at the first build.

Five principal architects write the designs. Each name is on the document.

Server racks with status lights

DGX B300
for 2026, Rubin NVL8 as the path

DC busbar
for rack power

Rear-door heat exchangers
on compute racks

Quantum-X800 InfiniBand
compute fabric

SN5610 pair
for the storage fabric

Full SU cabled now,
Rubin in a new hall

Where it applies.

Questions about this design.

Talk to an expert

NVIDIA DGX B300 systems, Quantum-X800 InfiniBand, Spectrum-4 SN5610 storage switches, and NVIDIA Mission Control with UFM 3.5.

Models and data pipelines, the enterprise network (Networking Blueprint) and the second scalable unit.

Diksha Shah, Principal AI Infrastructure Architect.

No. Symbeeo's industry research of September 2026 links no industry rule to this design's requirements, so none is named.

Read the design. Then build on it.

¹ Section 6 of the blueprint lists the failure conditions; the test plan sets their pass marks.