Utilities

Billing stopped. The water kept running.¹ We supply and integrate networks for water and power.

Request a quote

Utilities

Billing stopped. The water kept running.¹ We supply and integrate networks for water and power.

Request a quote

American Water, October 2024.¹

Its customer and billing platform was unavailable. It reported no sign its water and wastewater facilities were affected. The cases on this page are public record, not our clients.

We supply Cisco, Fortinet and Dell. None of them owns your updates.

Water.

We write into your requirement: if the office network is shut down, treatment and the control room keep working, and we test that. We check what in your control room still depends on the office network. Water system serving 3,301 to 49,999 people? Your emergency response plan certification is due by December 31, 2026 at the latest.¹⁰

Our coverage.

Every risk owned.²

Design study: the switch is end-of-sale. The plan covers all 60 substations.⁴

Electricity.

SektorCERT, May 2023: attackers got into 22 Danish energy companies; some owners thought updates were the vendor's job.⁵ We write into your requirement: every firewall has a named owner for updates, and the cost of installing them is in the contract.

Our coverage.

Every change reviewed, model-checked and reversible.⁶

Named engineers wrote these designs.

Principal architects David Morgan, Mark Winston, Steve Phillips and Avinash Dhinakaran.

Named engineers wrote these designs.

Principal architects David Morgan, Mark Winston, Steve Phillips and Avinash Dhinakaran.

Automation Blueprint

Every change reviewed, model-checked and reversible.⁶

Automation Blueprint

Every change reviewed, model-checked and reversible.⁶

01

Last-time buy first.

Design study: 12 spares bought before the last order date, Jan 7, 2027.⁴

02

5 years of support.

Each line ordered carries at least five years of published support from delivery.⁸

03

92 days between reviews.

Each critical supplier is reviewed at least every 92 days.⁸

Design studies

Four utility designs.

Talk to an expert about your requirement.

Send what you need to buy and by when. You get a reply the same day, then a quote.⁹

Talk to an expert about your requirement.

Send what you need to buy and by when. You get a reply the same day, then a quote.⁹

Compared. Then Delivered.

¹ American Water Form 8-K, event date October 3, 2024; press release, October 10, 2024.

² America's Water Infrastructure Act 2018 §2013 (SDWA §1433); Consulting & Engineering Blueprint, item 9.

³ Design study “Field workforce mobility for a water utility”, items 11 and 12.

⁴ Design study “Substation switch end-of-sale under NERC CIP-013”, items 1, 2, 4, 5 and 11.

⁵ SektorCERT, The attack against Danish critical infrastructure, November 2023.

⁶ Automation Blueprint, items 3, 4 and 6; Implementation Services Blueprint, item 8; design targets.

⁷ Strategic Resourcing Blueprint, item 12.

⁸ Strategic Resourcing Blueprint, items 9 and 10; a design target. Naming a rule is not a claim of compliance: your assessor decides, and Symbeeo holds no such certification or authorization.

⁹ We earn when you buy through us.

¹⁰ EPA, AWIA Section 2013 deadlines. Source.

The cases named above are public record, not our clients. The lines we write are our reading, not the source’s.